RU

EN

NET Company

— a technology company specializing in the supply of gas turbine and gas piston stations and integrated solutions for increasing the capacity of
generating plants

MAPS (PAES)-2500

mobile autonomous power station made in Russia

Our company offers mobile autonomous gasturbine thermal power plants of Russian production MAPS (PAES)-2500 (without foreign components). MAPS (PAES)-2500 is a highly efficient and modern system of power generation (2500 kW capacity), designed for rapid deployment and use in remote areas where access to electricity is limited, including construction sites, solutions for power supply of small settlements in the Russian Federation. Can be transported by road, rail and other modes of transport.

   

technical Specifications

Main characteristics:
1. Nominal capacity of the PAES: 2500 kW;
2. Max. drive power: 2750 kW;
3. Nominal voltage: 6300 V;
4. Rated frequency of alternating current: 50 Hz;
5. Rated power factor: 0.8;
6. Fuel consumption at rated load at generator terminals (2500kW):
- Fuel gas with a lower specific heat of combustion of 50,000 kJ/kg: 1050 kg/h;
- Liquid fuel with a lower specific heat of combustion of 42000 kJ/kg: 1100 kh/h
Natural gas as per GOST 5542 or associated petroleum gas with the calorific value of 43960 kJ/kg and the following parameters at the engine inlet are used as gaseous fuel for the primary gas turbine engine AI-20DKE/AI-20DKM of the power plant:
➢ pressure 1.0-1.2 MPa;
➢ The temperature is not more than 80 C;
➢ filtration purity, not more than 10 μm
PHOTO-2023-01-12-19-52-47 (2)
PHOTO-2023-01-12-19-52-48 (1)

These power plants are currently being successfully operated in the northern regions of our country. Power plants are designed for use as the main or backup source of electric power for industrial and residential facilities in areas remote from centralized power supply with minimal damage to the environment. Thermal power plants are capable of producing electricity and heat (steam or hot water for heating systems) in parallel.

The MAPS (PAES)-2500 power plant is manufactured in a container version and does not require the construction of buildings and various protective structures. To install one power plant at the place of use directly under the power plant, an area of 200 sq.m. (20x10 m) is sufficient, and for placement, in addition to the open area, indoor or hangar-type premises are also suitable.

VIDEO PRESENTATION

Service

Our group of companies provides service maintenance of the power plants manufactured and delivered to the Buyer (delivery of spare parts, repair, on-site upgrading, etc.).

Service 1

Under the agreement with the Buyer, our group of companies together with the Buyer are ready to select, train and send their employees on a «shift shift» basis to work at the Buyer’s (Customer’s) territory as operators, engineers and other specialists to ensure proper and trouble-free operation of our power plants, both during the warranty period and in the post warranty period.

Service 2

Under the contract with the Buyer, our group of companies performs annual post-warranty maintenance of the power plant at the Buyer’s premises. Post-warranty maintenance includes replacement of defective equipment, repairs and maintenance of the power plant, as well as in the presence of representatives of the Manufacturer during the period of operation at the Buyer’s premises.

Service 3

Under an additional contract with the Buyer will be carried out continuous monitoring of the technical condition of the equipment (subscription service).

GAS OPERATORS GENERATORS

GD1016L(A)-3000

2000GF10-T

1500GF-T

1000GF-T

500GF-T

Our company also offers gas piston generators with power of 500 kW, 1000 kW, 1500 kW, 2000 and 3000 kW from world manufacturers. These units achieve an optimal balance between thermal efficiency and adaptability to fuel gas supply. adaptability to the fuel gas supply. The generator engine designs utilize patented fine combustion technologies. Fully automatic air intake control system ensures minimal power loss in severe conditions. power loss in conditions of extreme heat, extreme cold, high altitude and high humidity, and the adaptability of the unit to the conditions of high humidity. humidity, and the unit's adaptability to the environment allows it to meet the needs of of most users

   

● Considering both pre- and post-supercharging mixing methods, the unit is guaranteed to be suitable for operation with both high and low pressure fuel gas. ● The multi-fuel ignition system effectively ensures the unit's ability to consistently ●The multi-fuel ignition system effectively ensures the unit's ability to operate consistently on a variety of gases and meet emission requirements. ●When using gas all serviceable parts of the generators can operate continuously and stably for more than 2,500 hours, and the maintenance time is short, thus significantly reducing the downtime of the unit
● High workload factor, the average annual workload of the unit can The average annual operating load of the unit can reach more than 90%, which can meet the needs of users who require continuous and stable operation at high loads. continuous and stable operation of the unit under high loads.
Low oil consumption, the oil consumption level of the unit is less than 0.4 g/kWh, which is close to the international level, and enables effective control of oil consumption. 0.4 g/kWh, which is close to the international level, and allows effective control of the unit's operating costs. the operating costs of the unit.

TECHNICAL CHARACTERISTICS OF GAS PISTON GENERATORS

Model: GD1016L/LA

Number of cylinders: 16

Engine speed: 1000 rpm

Rated engine power: 3000 kW

Gas heat consumption rate, 100% of calibrated power: 9.25 MJ/kWh

Calibrated oil consumption rate: 0.35 g/kWh

Oil tank: 1280 liters

Oil change intervals: 4200 h

Gas inlet pressure: 32 — 400 kPa

Plant dimensions: 8726 x 2458 x 3600 mm

Unit weight: 51600 kg.

Cost and payback period

Main type of raw materials

Natural gas.

Liquid fuel

Diesel fuel

The cost of MAPS (PAES)-2500 is negotiable and depends on the region of installation and configuration.

The terms of payment are agreed upon at the conclusion of the contract, including warranty and after-sales service. At the Buyer's request, the power plant can be supplemented with service and other equipment as agreed upon at the conclusion of the contract.

The payback period will depend on the cost of the main raw material - natural gas, but not more than 1.5 years from the date of commissioning.

Already at the end of the first half of the second year, the power plant owner will have recouped the cost of the purchase of the MAPS (PAES), and at the end of the second half, he will have saved significantly on electricity.

In addition, the power plant in question generates 6.1 MW or 5.24 Gcal/h of thermal energy as a byproduct, which can also be used profitably and thus make additional savings, thereby reducing the payback period of the investment.

Payback of 1.5 years
0%
  • Credit

    It is possible to provide a service for obtaining a special-purpose loan for the purchase of power plant(s) for your company.

About our group of companies

Our group of companies also carries out other activities in the financial sphere:

  • The credit sector

    Organization of credit, formation of credit policy, organization and management of the credit process

  • Investments

    Finding and attracting financial investments

  • New energy technologies

    Development, introduction, research, and application of new innovative energy technologies that allow to significantly reduce the cost of a unit of electricity within 1 ruble per 1 kW.

It's worth noting Our Strengths:

  • Collaboration

    Our company "NET" effectively cooperates and cooperates closely with VTB Bank and Gazprombank, which significantly strengthens our financial position in the Russian Federation

  • World stage

    Our group of companies includes companies located in Switzerland and Germany.

  • International experience

    Our employees have international financial experience in attracting investments for projects in the Russian Federation and CIS countries

To receive a commercial offer of LLC "NET", send an official letter of request from your company to the e-mail:

Location

143930, Moscow Region, Balashikha, Saltykovka

Contact us

WhatsApp: +7 (960) 452 86 10

© JJC NET 2023 All rights reserved.

Серафинит - АкселераторОптимизировано Серафинит - Акселератор